The demolition and reconstruction of A part of an existing building, including the wing of the building, or perhaps the conversion of the present building (or aspect) to an annexe can't be zero-rated as the construction of the annexe.If the building is 3 years old or more, the availability is exempt but where a long lease is included, the lease is